The West Downtown Reconstruction Project is focused on the reconstruction of Brundage Street from Thurmond Avenue, east to the alley that is west of Brooks Street. This project has been a priority in the Capital Improvement Plan since the 2014 CIP update, and will include replacement of the aged and corroded water and sewer mains, improvements to the existing storm drain, installation of new curb and gutter as well as sidewalk and concrete roadway surfacing. Enhancements will be similar to those found on Brooks St. including the addition of trees, continuation of the decorative lighting theme, placement of diagonal parking in the area along the north side of W. Brundage, and keeping parallel parking along the south side of Brundage St.

The public involvement plan involved going door to door with each property owner and business to gather their feedback and input, and to address any concerns with the design. Construction is will begin in early June 2018, with a 90 day calendar time frame for full completion.

The Design Engineer for this project is Trihydro Corporation of Sheridan, and the contractor is LJS Concrete and Excavation of Big Horn. This Project is fully funded with allocations from the Water & Sewer Funds and Capital Facilities Tax.

W. Downtown Reconstruction Project Map

Project Updates


  • Brundage Street is closed to traffic and construction is underway.
  • ALL BUSINESSES ARE OPEN and have pedestrian access at all times!!
  • Customer parking is available in nearby lots.
  • Please look for the business signs to access the businesses.
  • Water line construction was completed last week.
  • The Contractor will be installing the Storm Sewer line this week and next week.

Thank you for your understanding, cooperation and ongoing patience!

Please check our website regularly for construction updates and photos.

Construction
Construction


Subscribe to Mailing List

Email Address

First Name

Last Name



Security Measure
Submit a Question or Comment About the Project

Your Name (first and last)

Your Email (required)

Address

Street Address:

Address Line 2:

City:

State:

Zip:

Phone Number

Comment, Question or Suggestion



Security Measure

Project Contacts


Joe Schoen
City of Sheridan Assistant Engineer
Email: [email protected]
Phone: 307-675-4237

Rick Estes
Trihydro, Project Design Engineer
Email: [email protected]
Phone: 307-745-7474, ext. 4111

Cameron Brown
Trihydro, On-Site Project Engineer
Email: [email protected]
Phone: 404-408-3189